750 SD FF-05 - Rudder, Heel Support and Front Seat Channel Attach

Building The 750 SD Fuselage – FF-06

DATE: 01-16-2025 – TIME: 4:59 – 5:20 ~ 0:30

FF-06 in the Zenith 750 SD drawings deals with assembling the cabin sides, seat angle extrusions and some gussets.

I clecod everything to the LS75F10-3, cabin floor, to make sure everything fit and was in order. I took about 20 minutes to do and then I called it a day.

Leave a Reply

Your email address will not be published. Required fields are marked *