DATE: 10-23-2025 – TIME: 2:10 – 2:54 ~ 0:45
I began today by unpacking the controls kit, doing an inventory and then, after laying out the torque tube bearing on the front jump seat channel I decided I would separate all the hardware parts into labelled bins.
I did not have much time available to spend on the build today but I did at least get all the hardware into labelled bins.
There are a number of steel parts in the controls kit which I dropped off for powder coating and hopefully will have them back shortly so I can continue the build.
So basically there isn’t much to see here but it is part of my build log, so here it is.


